Generator day tanks range from very simple tanks to complex integrated systems. To make them easier to understand we break down the design process adding elements as needed to accomplish your design goals. Each Step results in a functional system, so you can just stop after the step that fulfills your requirements

Step 1: Basic Tank and Accessories

To provide a local fuel supply for the generator. Fuel delivery directly from truck to tank.

Image
DG610-Image-1

Step 2: Add Basic Sensors

To provide high level, low level, and leak status to the generator controls

Image
DG610-Image-2

Step 3: Add Remote Fill Station

To allow safe filling of the day tank from outside the building or enclosure.

Image
DG610-Image-3

Step 4: Add Filter Polisher

To assure cleanliness of fuel during storage, add a filter polisher, especially for tanks over 500 gallons.

Image
DG610-Image-4

Step 5: Add Auto Refill Components

To allow auto-refill of day tan from remote fuel storage tank, using an onboard duplex pump.

Image
DG610-Image-5_0

Step 6: Add Inlet Control Valves and Remote Pumps

Inlet refill valve is normally closed, and inlet high stop valve is normally open. Return Flow Pump for Overfill Protection also added

Image
DG610-Image-6

Step 7: Add Engine Supply Pipe Valves

Safety valves for anti-siphon and fire shutoff add safety to the system. Suction foot valve sometimes wanted for assurance of suction prime.

Image
DG610-Image-7

Step 8: Add Dual Components for Tier 4 Designs

Valves, Sensors, and Controls for dual active refill paths. Tier 4 Reliability Design Standards

Image
DG610-Image-8

NEED HELP SIZING?

Our engineers help you choose the right tank configuration for your facility, code, and site.

Still have questions?

Let's spec your storage tank system.

Tell us about your site, code jurisdiction, and generator load. We'll recommend the right aboveground or underground configuration.