Submitted by bill_edwards on Sat, 04/25/2015 - 13:36

 

Large generator sub-base tanks required safe tank fill systems for 16 generators at large data center facility.  The system design detailed in the case study provides redundant safe filling stations.

Redundant Master Controllers interface with the facility PMS, Power Management System, to allow the operators to have comprehensive monitoring of the fuel system.

Download the Case Study

 

      

Microflow System - Standalone Sub-Base Tank.jpg