Amtrak Rail Yard , Oakland, CA
Signature Flight Support, Chicago, IL
CP Rail System, St. Paul, MN
US Border Patrol , TX and CA |
| |
 |
Amtrak Rail Yard , Oakland, CA |
| |
Earthsafe provided a high speed diesel fueling system for locomotives along with oil dispensing stations at the service track and maintenance buildings. The system included 2 aboveground tanks of 30,000 gallon capacity, pumped fuel receiving station, transfer pump house, filtration system, and 4 dispensing cranes. An advanced control system collected data on the dispensing operation for use in the supervisors facility. |
|
 |
Signature Flight Support , Chicago, IL |
| |
| Earthsafe provided underground fuel storage systems for Jet-A and Avgas fuels along with aboveground diesel and gasoline systems for ramp equipment. Aviation fuels were received and dispensed through filtration systems to maintain product quality. Tight site constraints required the use of an innovative shoring system for the underground tank installation. |
|
 |
CP Rail System, St. Paul, MN |
| |
The railroad yard and maintenance facility generated oil contaminated stormwater runoff that exceeded regulatory limits. Earthsafe installed a oily water treatment and oil collection system to remove oil from the wastewater stream. The system included grit and trash separation, oil separation, oil collection and storage, and a metering building. The installation was complicated by a 33 foot excavation depth required to allow gravity flow from the site. The installation adjacent to the Mississippi River required a wellpoint dewatering system to accomplish the work.
|
|
|
U.S. Border Patrol, TX and CA |
| |
The US Border Patrol required a program to upgrade their fueling capabilities at about 15 border patrol facilities along the US southern border. Fueling requirements included aircraft, trucks, busses, watercraft, and ATVs. Earthsafe provided aboveground fuel storage tanks and fuel dispensing systems to meet the specific requirements for the site. In addition, advanced fuel management computer systems were installed to allow for efficient operation of the sites. |
| |
|
|